Lately I've found that I've been spending a lot of time reading other people's blogs rather than writing mine own. Here two of my favorite blogs right now:
http://www.mosaic-blog.com/ - Emma Biggs' new(ish) blog. an interesting and thought provoking look into her world and amazing mind.
http://mosaicartnow.blogspot.com/ - Nancie does a wonderful job of scouring the cyber-world for interesting mosaic related sites, news, reviews, ect.
Not to mention keeping up with Sonia King's Facebook page- lately all of her "friends" have been drooling over her new studio.
I don't think I ever "reported" on my workshop in Dallas with Lynne Chinn - it was educational and fun! Thanks to the H1N1 virus we had a small class- which gave us lots of teacher one-on-one time not to mention the opportunity to get to know the other class members. Lynne is extremely knowledgable and giving.
Happy New Year- may it be productive and creative!
Oh- I need to mention--I have been getting a lot of weird comments that are obviously some sort of spam- so, I don't post anoymous comments- please leave your name!
Showing posts with label Sonia King. Show all posts
Showing posts with label Sonia King. Show all posts
Sunday, January 10, 2010
Saturday, September 30, 2006
"Emerge" - September, 2006
I began this piece at an advanced workshop with Sonia King and Emma Biggs in Dallas in August, 2006. I was a bit worried about taking an "Advanced" workshop- but should not have- learned lots- it was great! They are 2 of the best teachers. The piece has taken me about 50 hours to complete. I spent a lot of time thinking about this piece- almost a year in fact! The final design looks a lot different than what I planned. The concept of the slate "river" is there, and most of the material is the same- but I received such wonderful input about design from the workshop. I got a bit of insight about reflectivity and how to combine materials. The copper wiring looked too "new" - so I passed it through the burner on my gas stove- gave it a great patina! I am thinking about turning this piece on it's side, because I think the top is a bit heavy. One problem though- I "signed" it - with a tile "B" in the lower right hand corner- (I think it is cut off in this photo) - should have taken Sonia's advice and left space in all corners until I decided which way the piece would turned. I actually did not think that would be a problem until I was finished! The materials used in the piece are copper nuggets, slate, copper smalti, pebbles, marble, van Gogh tiles, safety glass and NZ paua shell.

I began this piece at an advanced workshop with Sonia King and Emma Biggs in Dallas in August, 2006. I was a bit worried about taking an "Advanced" workshop- but should not have- learned lots- it was great! They are 2 of the best teachers. The piece has taken me about 50 hours to complete. I spent a lot of time thinking about this piece- almost a year in fact! The final design looks a lot different than what I planned. The concept of the slate "river" is there, and most of the material is the same- but I received such wonderful input about design from the workshop. I got a bit of insight about reflectivity and how to combine materials. The copper wiring looked too "new" - so I passed it through the burner on my gas stove- gave it a great patina! I am thinking about turning this piece on it's side, because I think the top is a bit heavy. One problem though- I "signed" it - with a tile "B" in the lower right hand corner- (I think it is cut off in this photo) - should have taken Sonia's advice and left space in all corners until I decided which way the piece would turned. I actually did not think that would be a problem until I was finished! The materials used in the piece are copper nuggets, slate, copper smalti, pebbles, marble, van Gogh tiles, safety glass and NZ paua shell.
Subscribe to:
Posts (Atom)
